Gas Liquids Engineering Ltd. (GLE) completed EPCM services for the detailed design of a greenfield quad oil pad for Athabasca Oil Corporation. The new pad site was designed to accommodate a six (6) well expansion on the pad. Startup date was March 2020. Initially installed equipment included:
- Four (4) Wellheads
- 2 MMSCF/d Gas Volume Each
- 400 bbl/day Oil Volume Each
- 400 bbl/day Water Volume Each
- One (1) Quad Separator Package
- One (1) Remote Terminal Unit (RTU) Panel
- One (1) 1000 Gallon Methanol Tank
- One (1) 1000 Gallon Paraffin Inhibitor Tank
- One (1) 500 Gallon Corrosion Inhibitor Tank
- One (1) Thermoelectric Generator (TEG)
- One (1) 8” CL600 Low Pressure (LP) Pig Launcher
- One (1) 6” CL600 High Pressure (HP) Pig Launcher
- One (1) 3” CL600 Fuel Gas Pipeline
- One (1) 4” CL1500 Lift Gas Pipeline