Altagas – Harmattan Ethane Extraction Plant

An EPCM brownfield project to modify an ethane extraction plant to increase production from 275 MMSCF/d to 400 MMSCF/d. The project involved installation of new equipment and modification of existing equipment within the facility. The design features included:

  • Inlet compressor – Centrifugal – EMD (5200 hp)
  • Residue gas compressor – Centrifugal – EMD (8500 hp)
  • Sales gas compressors – Replaced two 2400 hp engines with two 4000 hp electric motor drives
  • Replaced two 2000 hp gas driven refrigeration compressors with a 7500 hp Elliot centrifugal refrigeration compressor
  • Solar Turbine Driver c/w condensers, accumulator, and economizer refrigeration system which was tied into existing refrigeration system
  • Added a waste heat recovery system to refrigeration compressor exhaust. Recovered heat merged into existing Heat Medium system.
  • Retrofitted two 800 hp steam turbines in refrigeration service
  • Replaced the existing 250 MMSCF/d turbo-expander with a 400 MMSCF/d turbo-expander
  • Modified de-ethanizers to create two trains. De-ethanizer modifications included change-out of trays and addition of tower nozzles. With the changes, a reduction in refrigeration duty and an increase in de-ethanizer capacity was realized.
  • Added two 5560 kW de-ethanizer overhead condensers and three 350 hp pumps to convert to full ethane condensing

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy