Altagas – Blair Creek

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for two expansions to the Blair Creek gas processing facility, as well as an 8 km long gathering pipeline.

Expansion 1

Gas Liquids Engineering Ltd. (GLE) designed and provided construction management support of a major gas plant modification to process an additional 46 MMSCF/d, increasing plant capacity to 64 MMSCF/d.

  • Twinning of an inlet raw gas pipeline
  • Inlet separator sized for 64 MMSCF/d
  • Three (3) 2-stage Ariel compressors (1 x JGK/4, 2 x JGD/4) with Waukesha natural gas drivers (1 x 1680 hp, 2 x 1970 hp) for inlet and sales compression
  • Two refrigeration units (primary and secondary) for high liquids recovery
    • The primary refrigeration unit utilizes a single stage Mycom screw compressor with a 500 hp electric driver
    • The secondary refrigeration unit utilizes a single stage Mycom screw compressor with a 600 hp electric driver
  • Glycol still vent condensing tank for reduction of BTEX emissions
  • Liquids fractionation including a stabilizer and de-ethanizer
  • Recycle compression
  • Processed liquids storage including 3000 bbl total condensate storage and 250,000 US Gallon of Natural Gas Liquids (NGL) storage
  • Vapour recovery unit (with backup venturi educator) to eliminate emissions from condensate and produced water storage tanks
  • Flare system with header, knockout drum and 140 ft (43 m) tall stack
  • Electric power generation with 800 kW output
  • Full plant utilities including:
    • Fuel gas system
    • Fuel gas system
    • Instrument air  Heat medium system with heater providing 6.5 MMBtu/h (1907 kW) of duty
    • Drain and storage systems for closed hydrocarbon drains, floor drains, and glycol drains
    • Integrated plant control system, including plant DCS, unit control systems and ESD system
    • Site civil design and work including grading plans, drainage pond, buildings, foundations and structural steel

Expansion 2

GLE provided EPCM services, including regulatory requirements, for the additional expansion of the Blair Creek gas plant in 2015. Throughput was increased from 64 MMSCF/d to 84 MMSCF/d (compressors at reduced load), with future throughput capability of 110 MMSCF/d. Project scope included the installation of:

  • One (1) 2-stage compressor (Ariel JGC/4) driven by a G3608-LE Cat Engine (2370 hp)
  • One (1) dual fan overhead aerial cooler
  • One (1) natural gas compressor building
  • Associated above ground piping complete with tie-ins and piles
  • All control and instrumentation to facilitate complete remote automated control
  • Wiring of additional components
  • Full in-house EI&C Engineering

Gathering Pipeline

Detailed design work and construction management support for the installation of an 8 km long sweet raw gas gathering pipeline, which loops an existing gathering line from Progress Energy’s c-89-G/94-B-16 wellsite to AltaGas’ Blair Creek Gas Plant within d-58-F/94-B-16. The line was designed to accommodate 20 MMSCF/d of multiphase well production (gas, condensate, and water) at a MOP of 9930 kPag (1440 psig). The project also included modifications at the c-89-G wellsite, pigging facilities, installation of a camelback riser near the midpoint of the right-of-way (to accommodate flow from Painted Pony Petroleum and interconnect with the existing AltaGas 6” gathering pipeline), and tie-ins at the Blair Creek Gas Plant. Project scope of the pipeline included:

  • 8 km (5 mile) long pipeline, 273.1 mm OD (10 NPS)
  • Maximum Operating Pressure (MOP) of 9930 kPag (1440 psig)
  • 1 Intermediate camelback riser
  • Pig sender + receiver
  • Full integration with AltaGas’ existing pipeline system
  • Re-routing to avoid archaeological sites discovered on the right-of-way
  • Two creek crossings

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy