Altagas – Blair Creek Pipeline

Gas Liquids Engineering Ltd. (GLE) provided detailed design work and construction management support for the installation of an 8 km long sweet raw gas gathering pipeline, which loops an existing gathering line from Progress Energy’s c-89-G/94-B-16 wellsite to AltaGas’ Blair Creek Gas Plant within d-58-F/94-B-16. The line was designed to accommodate 20 MMSCF/d of multiphase well production (gas, condensate, and water) at a MOP of 9930 kPag (1440 psig). The project also included modifications at the c-89-G wellsite, pigging facilities, installation of a camelback riser near the midpoint of the right-of-way (to accommodate flow from Painted Pony Petroleum and interconnect with the existing AltaGas 6” gathering pipeline), and tie-ins at the Blair Creek Gas Plant. Project scope of the pipeline included:

  • 8 km (5 mile) long pipeline, 273.1 mm OD (10 NPS)
  • Maximum Operating Pressure (MOP) of 9930 kPag (1440 psig)
  • 1 Intermediate camelback riser
  • Pig sender + receiver
  • Full integration with AltaGas’ existing pipeline system
  • Re-routing to avoid archaeological sites discovered on the right-of-way
  • Two creek crossings

On this website we use first or third-party tools that store small files (cookie) on your device. Our cookies are used to generate navigation usage reports. You have the right to choose whether or not to enable these cookies. By enabling these cookies, you help us to offer you a better experience. Cookie policy