Gas Liquids Engineering Ltd. (GLE) is currently undertaking EPCM services for Husky Energy to construct a multi-well gas battery in the Wembley area. The facility is located 55 km Northwest of Grand Prairie, Alberta.
The pad is designed to be executed in multiple phases, with Phase 1 including the installation of 3 of the 12 proposed wells to be installed on the lease.
Installed equipment will include:
- Three (3) New Wells; each c/w
- Wellhead ESDV
- Sand Separator
- Inlet Control Valve (Angle Choke)
- Triple Separator Package
- Three (3) 3-Phase Separators
- One (1) Instrument Air Compressor
- Ten (10) Injection Pumps
- One (1) RTU Panel
- Chemical Tank Skid
- Two (2) produced water storage vessels
- HP Flare Knock Out Drum
- Dual HP Flare stack
- Communication Tower / Radio Mast (TBD with Path Study)