Enerplus – Oil Bantry

Gas Liquids Engineering Ltd. (GLE) provided EPCM services for a new oil battery to handle production of 6700 m3/d of emulsion consisting of 6100m3/d of water, 600m3/d of oil, and 15 MMSCF/d of associated gas from numerous wells in the Bantry region. The oil battery treats oil and gas to pipeline specification and disposes of produced water. Project scope included:

  • 6700 m³/d total emulsion liquid and associated gas inlet rate
    • 600 m³/d inlet oil rate
    • 6100 m³/d inlet water rate
    • 15 MMSCF/d inlet gas rate
  • Free Water Knock-Out (FWKO) Drum
  • One (1) 10′ x 40’ long Treater with two (2) 24” firetubes rated at 3.2 MMBtu/hr
  • Water Injection Pumps
    • Upgrade a repurposed 1000 hp Bingham centrifugal water injection pump from an existing interpipe facility with a new 1000 hp VFD to replace existing 700 hp VFD
    • New 1000 hp Bingham centrifugal water injection pump and new VFD
  • Two (2) 1250 hp Waukesaw driven, Ariel 4-throw 3-stage compressors
  • Single stage VRU
  • Tuberías
  • Metering
  • Flare
  • 1.25 MMBtu/h heat medium
  • Storage tanks
    • Two (2) 5000 bbl water tanks
    • One (1) 2500 bbl sales oil tank
    • One (1) 2500 bbl production oil tank
    • One (1) 2500 bbl slop / divert / truck tank