ATCO Midstream - Golden Spike
- Engineering and technical auditing of the detailed design for a 40 MMSCFD sour gas plant involving 450 HP acid gas (50% H2S) injection, turbo expansion and coldbox, ethane extraction, mole sieve, and mercaptan removal. Project management and engineering management, EPC contract development and administration, start-up services.
- AENV permit application. EUB permit applications and audit manuals.
- Study of third party gas processing options.
- Process design, permitting and project management for a 12 MMSCFD sacrificial sweetening system. Project included Solar compressor upgrades, replacement of trays with structured packing and construction management.
- Acid gas volume: 212 cum/d. Acid gas compression: 450 HP.
Kinder Morgan - Snyder, Texas
- Preliminary design of a 45 MMSCFD expander plant to strip C2+ liquids from a 700 MMSCFD 90% CO2 feed stream.
PDVSA/Tivenca - Maracaibo
- Conceptual design of multiple processing options for 1200 MMSCFD gas stream including CO2 removal, ethane recovery, turbo-expander facility, mercury removal and a nitrogen rejection facility.
Red Mountain, Minnibai, Russia
- Conceptual design and basic engineering of 45 MMSCFD cryogenic gas facility.
Solex Gas Processing, Harmattan
- 200 MMSCFD gas plant expansion with ethane recovery.